Jan 27, 2019 11:56
5 yrs ago
inglés term
Filling
inglés al español
Negocios/Finanzas
Transporte / Fletes
Major Canals- Suez Canal
The dimensions of the Kiel Canal are:
Length: 98.637 km
Width at the waterline :162 m (partly 102.5 m)
Width at the bottom: 90 m (partly 44 m)
Water depth:11 m
Usable length:125 m
Usable width:22 m
Lock sill depth:Brunsbüttel NN-10.20 m and in Kiel-Holtenau NN- 9.80 m
Mitred lock gates:Two ebb tide and two flood tide doors per chamber
Filling : Through two side channels, each with 12 branch channels
Lock transit time
30 - 40 minutes
I assume it refers to the filling of water,
Thanks
Length: 98.637 km
Width at the waterline :162 m (partly 102.5 m)
Width at the bottom: 90 m (partly 44 m)
Water depth:11 m
Usable length:125 m
Usable width:22 m
Lock sill depth:Brunsbüttel NN-10.20 m and in Kiel-Holtenau NN- 9.80 m
Mitred lock gates:Two ebb tide and two flood tide doors per chamber
Filling : Through two side channels, each with 12 branch channels
Lock transit time
30 - 40 minutes
I assume it refers to the filling of water,
Thanks
Proposed translations
(español)
4 +6 | llenado | Mariana Gutierrez |
Proposed translations
+6
13 minutos
Selected
llenado
https://es.wikipedia.org/wiki/Esclusa
Las esclusas son obras hidráulicas que permiten vencer desniveles concentrados en canales navegables, elevando o descendiendo los navíos ... hacer un llenado o vaciado de la esclusa si no hay un navío que requiere de atravesarla.
4 KudoZ points awarded for this answer.
Comment: "Gracias"
Something went wrong...