Glossary entry

inglés term or phrase:

mandays

español translation:

días-persona

Added to glossary by Begoña García Soler
Nov 21, 2007 11:48
16 yrs ago
24 viewers *
inglés term

mandays

inglés al español Negocios/Finanzas Recursos humanos plan de servicio de aguas
Proposed mandays shall follow the format set out in Attachment 4. CVs shall follow the format shown in Attachment 5. The completed Attachments 3, 4 and 5 will form part of this sub-Plan.

No sé si será un error tipográfico, pero estos "mandays" me están volviendo loca.

Gracias por adelantado
Change log

Nov 21, 2007 13:39: Fabio Descalzi changed "Field" from "Técnico/Ingeniería" to "Negocios/Finanzas" , "Field (specific)" from "Electrónica / Ing. elect." to "Recursos humanos"

Proposed translations

18 minutos
Selected

días-persona

O días-hombre O:)

No te recomendaría "días de trabajo", porque por lo general se utiliza esta expresión como indicador de extensión en el tiempo, mientras "mandays" o días-persona son un indicador de ESFUERZO.

Así, 5 días-persona también pueden equivaler a 1 día (de trabajo), si hablamos de algo que se va a realizar con 5 personas trabajando simultáneamente.

Salud!

--------------------------------------------------
Note added at 20 mins (2007-11-21 12:09:14 GMT)
--------------------------------------------------

Nada raro, ¿eh?: es una medida habitual de esfuerzo en gestión de proyectos.
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Me quedo con "días-hombre". Gracias a todos"
+2
10 minutos

días-hombre

No sé si será el contexto... se me ocurre "días-hombre", del estilo de "horas-hombre"
http://laborsta.ilo.org/applv8/data/SSM2/S/IN4.html
Horas de trabajo
los datos se refieren a horas/hombre trabajadas, tanto ordinarias como extraordinarias trabajadas todos los días. Se estima como el cúmulo de horas trabajadas por cada turno sucesivo comprendido en el período.
Los datos sobre horas/hombre trabajadas se refieren sólo a trabajadores de la producción y afines, según se les ha definido anteriormente.
No se reúnen datos sobre horas normales de trabajo.
Los días/hombre trabajados es el total de los cumplidos por trabajadores permanente directamente empleados durante cada mes del año de referencia y representa la suma de trabajadores que han concurrido a cada uno de los turnos trabajados durante todos los días del mes.

--------------------------------------------------
Note added at 1 hr (2007-11-21 13:39:22 GMT)
--------------------------------------------------

http://www.ilo.org/public/english/employment/recon/eiip/asis...
Table 4. Productivity data for ditching and sloping on AL3-FM
1) T is the input time ratio, defined as ratio of the actual number of hours spent on the task to the number of hours available in a manday, i.e., 8 hours. (2) Output in m3.
The effect of the inexperience of the new workers is evidenced by the relatively large T values for similar outputs. The equivalent hourly productivity rates are plotted against progress of work in Fig. 5. It can be seen that whereas on the average experienced hands achieved 1.04m3/hr inexperienced workers achieved only 0.73m3/hr. The hourly productivity of experienced hands was, therefore, 1.4 times that of inexperienced hands. Due to the relatively large float of time available in an 8- hour work day, such differences do not necessarily manifest themselves in the productivity rates per manday.
As expected in task work contracts, no correlation was observed between the level of supervision and the productivity rate per manday.
The average productivity rates measured on the various contractor sites are compared with some DFR suggested rates in Table 5. No attempt is made in these tables to separate the effects of the various factors on the average productivity rates since the individual effects could not be conclusively evaluated in these studies. However, for camber formation and gravel spreading, the quoted values of 50m2/manday were derived from technical quality considerations. It may be noted that these values are lower than the actual average values of 90m2/manday and 86m2/manday measured for camber formation and gravel spreading respectively. The results suggest that the DFR rates for bushclearing are rather ambitious but that the average DFR suggested rates for excavation are lower than the mean output in the field. The results suggests that for several activities, the productivity rates for planning labour-based projects may be different from those achieved on site.
Peer comment(s):

agree Lara Galgani : Me parece una buena opción. Yo personalmente nunca había visto manday, pero man-hour es súper común.
42 minutos
Tal cual - parecía una typo, pero lo encontré en la OIT / ILO
agree slothm : Sin duda.
1 hora
:)
Something went wrong...
14 minutos

día de trabajo

Apparently it is an industrial unit of production: 1 manday = the work done by 1 man on 1 day. If for example it refers to an audit it will be translated as '1 día de auditor´.

--------------------------------------------------
Note added at 18 mins (2007-11-21 12:07:05 GMT)
--------------------------------------------------

http://www.ipes.org/au/pdfs/rau7/AU-7 page 29 Haroonabad.pdf

--------------------------------------------------
Note added at 2 hrs (2007-11-21 14:12:44 GMT)
--------------------------------------------------

Estoy de acuerdo con los matices añadidos. A menudo en los presupuestos de obras se define como:

horas/día/persona
Something went wrong...
2 horas

horas/día/persona

Me parece que este es el término que se usa normalmente.

Suerte!
Something went wrong...
3 horas

jornadas (de trabajo)

otra
Something went wrong...
3 horas

Plan de trabajo

Más arriesgada, pero parece que hay una Gantt chart o así que refleja los días que se trabajará y el número de personas que trabajará cada día