Nov 14, 2003 11:17
20 yrs ago
1 viewer *
Spanish term
250 de corona
Spanish to English
Tech/Engineering
Para recibir embarcaciones de gran calado y permitir su movimiento sin contratiempos, el canal de acceso es de 600 metros de longitud, 16 de profundidad, 110 de plantilla, 250 de corona
Proposed translations
(English)
4 +1 | top width of 250 | Nikki Graham |
4 | 250 on the top / 250 above | Michael Powers (PhD) |
Proposed translations
5 mins
250 on the top / 250 above
Declined
I think this is what is meant.
Mike :)
Mike :)
Comment: "Encontré la respuesta. Gracias powersmd"
+1
4 hrs
top width of 250
Declined
I have actually already answered this in your previous question, when I said that I thought the corona was the top width.
The applicant proposes to excavate a channel approximately 5,300 linear feet in length to 15 feet deep with a 30-foot bottom width, and a 75-foot top width
--------------------------------------------------
Note added at 4 hrs 54 mins (2003-11-14 16:11:42 GMT)
--------------------------------------------------
Completed in May 1996, the Channel, through Vermillion Bay, and intersecting the Intracoastal Waterway, has 150\' bottom width and a minimum of 200\' of top width. The Channel is under navigational supervision of the U.S. Coast Guard.
http://www.geoshipyard.com/shipyard/repair_yard.htm
--------------------------------------------------
Note added at 5 hrs 16 mins (2003-11-14 16:33:50 GMT)
--------------------------------------------------
In doing this the new bottom width would increase, depending on justified depth and location, from 12 to 42 feet less than the bottom width of the existing channel, while the top width would remain the same
http://planning.saj.usace.army.mil/envdocs/JaxHbr/FEIS.htm
--------------------------------------------------
Note added at 5 hrs 19 mins (2003-11-14 16:37:00 GMT)
--------------------------------------------------
The channel was dug 36 feet deep by 500 feet across (bottom width) and 600 feet across (top width).
http://www.saveourlake.org/area2.html
The applicant proposes to excavate a channel approximately 5,300 linear feet in length to 15 feet deep with a 30-foot bottom width, and a 75-foot top width
--------------------------------------------------
Note added at 4 hrs 54 mins (2003-11-14 16:11:42 GMT)
--------------------------------------------------
Completed in May 1996, the Channel, through Vermillion Bay, and intersecting the Intracoastal Waterway, has 150\' bottom width and a minimum of 200\' of top width. The Channel is under navigational supervision of the U.S. Coast Guard.
http://www.geoshipyard.com/shipyard/repair_yard.htm
--------------------------------------------------
Note added at 5 hrs 16 mins (2003-11-14 16:33:50 GMT)
--------------------------------------------------
In doing this the new bottom width would increase, depending on justified depth and location, from 12 to 42 feet less than the bottom width of the existing channel, while the top width would remain the same
http://planning.saj.usace.army.mil/envdocs/JaxHbr/FEIS.htm
--------------------------------------------------
Note added at 5 hrs 19 mins (2003-11-14 16:37:00 GMT)
--------------------------------------------------
The channel was dug 36 feet deep by 500 feet across (bottom width) and 600 feet across (top width).
http://www.saveourlake.org/area2.html
Reference:
http://texinfo.library.unt.edu/texasregister/html/2001/Jun-08/in-addition/in-addition.html
Comment: "Buen intento, encontré la re. De todos modos muchas gracias."
Something went wrong...