GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
10:38 Sep 12, 2009 |
German to English translations [PRO] Tech/Engineering - Transport / Transportation / Shipping / railways, hazard analysis, hazards at the interlocking system level | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Blaess Germany Local time: 18:07 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 | trapping |
| ||
3 | Total protection |
|
Discussion entries: 1 | |
---|---|
trapping Explanation: alternativ: Flank Protection and Trapping (tapping ist aber im deutschen Gebrauch ein Teil des Flankenschutzes) http://en.wikipedia.org/wiki/Track_circuit_interrupter alternativ gebräuchlich (aber ungenau, da Begriff zu eineingend): trap points (das bezöge sich dabei aber nur auf entsprechende Weichen) Da es sich um eine Flankenschutzmaßnahme handelt, gehe ich davon aus, dass Absolutschutz = zwingender Flankenschutz zu setzen ist. Zwingender Flankenschutz umfasst u.a. Gleissperren und Schutzweichen. "Gleissperren und Schutzweichen bieten sicheren Flankenschutz, auch zwingender Flankenschutz genannt. Signale bieten nur indirekten Flankenschutz, weil sie auch beachtet werden müssen – man spricht von Lichtschutz." http://de.wikipedia.org/wiki/Fahrstraße "zwingender Flankenschutz (also z.B. durch eine Schutz- weiche) ist bei Hoechstgeschwindigkeiten von mehr als 160 km/h vorgeschrieben, ..." http://www.ureader.de/msg/13957329.aspx -------------------------------------------------- Note added at 2 hrs (2009-09-12 13:03:56 GMT) -------------------------------------------------- Link from above reloaded: http://en.wikipedia.org/wiki/Track_circuit_interrupter "There are no conflicting movements because when the junction is set for a train from the Up Branch points x act as flank protection trapping the unauthorised movement [which has started against the platform signal 1] away from the movement from the branch." http://www.rgsonline.co.uk/Railway_Group_Standards/Control C... -------------------------------------------------- Note added at 2 hrs (2009-09-12 13:05:19 GMT) -------------------------------------------------- Link 2 from above reloaded: http://de.wikipedia.org/wiki/Fahrstraße if it fails to work use wiki + fahrstrasse instead -------------------------------------------------- Note added at 4 hrs (2009-09-12 15:23:50 GMT) -------------------------------------------------- GK/RT0064 Provision of Overlaps, Flank Protectionand Trapping13/11/07 20/05/10 25% GK/RT0064 Provision of Overlaps, Flank Protection and Trapping http://www.rssb.co.uk/pdf/ERTMS Standards Programme.pdf Progress report from action holder July 2002 Railtrack report that the intent of the recommendation is covered in the RGS "Provision of overlaps, flank protection, and trapping" Standard (GK/RT/0064). http://www.railwaysarchive.co.uk/documents/HSE_Prog001.pdf |
| ||
Notes to answerer
| |||